Jinnah barrage
Jinnah barrage on the River Indus near kalabagh in Pakistan construction started beginning in 1939 and it's opening date was 1946. The height of barrage is 8.5 m (28ft) length is 1152 m (3780ft) & spillway capacity is 950,000 cu ft/s (27000 m3/s) . It is the part of that project which help in irrigate in the Sindh. Sagar Doad east in Indus. In June 2012 a major rehabilitation for the barrage begin. It's includes the construction of a weir 244m (801ft) and the project is expected to be complete in June 2016 .The new guide banks will be built and existing ones repaired.
Comments
Post a Comment